Author: stshipler
-
Demolition Debris Planning: Reuse, Recycling and Disposal

Plan demolition debris handling before removal by defining material streams, contamination questions, haul-off and receiving responsibilities. Read more
-
Construction Entrance Planning: Control Mud Before Site Work

Plan a construction entrance around access, drainage, track-out, maintenance and restoration before excavation or site work begins. Read more
-
Site Clearing Before Excavation: Boundaries, Utilities and Erosion

Plan site clearing before excavation by defining boundaries, retained features, utility coordination, debris handling and erosion controls. Read more
-
Excavation Safety Planning: What Property Owners Should Confirm

Plan excavation work around utility coordination, site access, changing conditions and contractor-controlled safety responsibilities. Read more
-
A Phased Plan for Pond Excavation at Caldwell Creek HOA

Iron Earth’s proposed Caldwell Creek HOA pond excavation begins with two ponds, five workdays and a four-foot center water-depth target. Read more
-
Building Pad Preparation: What North Texas Owners Should Define

Define building pad preparation with approved plans, soil and drainage information, access details and a clear handoff to the builder. Read more
-
Retaining Wall Removal: Questions Before Demolition Begins

Plan retaining wall removal with a review of the wall’s function, adjacent conditions, utilities, debris and the required replacement handoff. Read more
-
Private Utility Locating Before Excavation in North Texas

Coordinate Texas811 responses and private utility locating before excavation, then share the complete information with the responsible dig crew. Read more
-
Concrete Driveway Removal: Plan the Demolition and Handoff

Plan concrete driveway removal with clear limits, access, debris haul-off and a defined handoff to the replacement contractor. Read more
-
Concrete Curing: Plan Access Before the Pour
Plan concrete curing before your North Texas project. Clarify access, protection, later deliveries and reopening with the contractor before the pour. Read more